<Project xmlns="http://schemas.microsoft.com/project">
  <!--Published by Aspose.Tasks for .NET 23.7-->
  <SaveVersion>14</SaveVersion>
  <UID>1</UID>
  <Name>MSProjectTemplateFile</Name>
  <GUID>B85FBB29-C572-E511-828B-FCAA14B63A94</GUID>
  <Title>Q4 - Internal IT</Title>
  <Author>Gayani Mahawatte</Author>
  <CreationDate>2015-10-14T22:44:00</CreationDate>
  <LastSaved>2025-05-15T03:04:21</LastSaved>
  <ScheduleFromStart>1</ScheduleFromStart>
  <StartDate>2024-08-05T00:00:00</StartDate>
  <FinishDate>2025-06-15T23:59:59</FinishDate>
  <FYStartDate>1</FYStartDate>
  <CriticalSlackLimit>0</CriticalSlackLimit>
  <CurrencyDigits>2</CurrencyDigits>
  <CurrencySymbol>$</CurrencySymbol>
  <CurrencyCode>NZD</CurrencyCode>
  <CurrencySymbolPosition>0</CurrencySymbolPosition>
  <CalendarUID>1</CalendarUID>
  <DefaultStartTime>08:00:00</DefaultStartTime>
  <DefaultFinishTime>17:00:00</DefaultFinishTime>
  <MinutesPerDay>480</MinutesPerDay>
  <MinutesPerWeek>2400</MinutesPerWeek>
  <DaysPerMonth>20</DaysPerMonth>
  <DefaultTaskType>0</DefaultTaskType>
  <DefaultFixedCostAccrual>3</DefaultFixedCostAccrual>
  <DefaultStandardRate>0</DefaultStandardRate>
  <DefaultOvertimeRate>0</DefaultOvertimeRate>
  <DurationFormat>7</DurationFormat>
  <WorkFormat>2</WorkFormat>
  <EditableActualCosts>0</EditableActualCosts>
  <HonorConstraints>0</HonorConstraints>
  <InsertedProjectsLikeSummary>1</InsertedProjectsLikeSummary>
  <MultipleCriticalPaths>0</MultipleCriticalPaths>
  <NewTasksEffortDriven>0</NewTasksEffortDriven>
  <NewTasksEstimated>1</NewTasksEstimated>
  <SplitsInProgressTasks>1</SplitsInProgressTasks>
  <SpreadActualCost>0</SpreadActualCost>
  <SpreadPercentComplete>0</SpreadPercentComplete>
  <TaskUpdatesResource>0</TaskUpdatesResource>
  <FiscalYearStart>0</FiscalYearStart>
  <WeekStartDay>1</WeekStartDay>
  <MoveCompletedEndsBack>0</MoveCompletedEndsBack>
  <MoveRemainingStartsBack>0</MoveRemainingStartsBack>
  <MoveRemainingStartsForward>0</MoveRemainingStartsForward>
  <MoveCompletedEndsForward>0</MoveCompletedEndsForward>
  <BaselineForEarnedValue>0</BaselineForEarnedValue>
  <AutoAddNewResourcesAndTasks>1</AutoAddNewResourcesAndTasks>
  <CurrentDate>2015-10-15T08:00:00</CurrentDate>
  <MicrosoftProjectServerURL>0</MicrosoftProjectServerURL>
  <Autolink>0</Autolink>
  <NewTaskStartDate>0</NewTaskStartDate>
  <NewTasksAreManual>0</NewTasksAreManual>
  <DefaultTaskEVMethod>0</DefaultTaskEVMethod>
  <ProjectExternallyEdited>0</ProjectExternallyEdited>
  <ExtendedCreationDate>1984-01-01T00:00:00</ExtendedCreationDate>
  <ActualsInSync>0</ActualsInSync>
  <RemoveFileProperties>0</RemoveFileProperties>
  <AdminProject>0</AdminProject>
  <UpdateManuallyScheduledTasksWhenEditingLinks>1</UpdateManuallyScheduledTasksWhenEditingLinks>
  <KeepTaskOnNearestWorkingTimeWhenMadeAutoScheduled>0</KeepTaskOnNearestWorkingTimeWhenMadeAutoScheduled>
  <OutlineCodes />
  <WBSMasks />
  <ExtendedAttributes>
    <ExtendedAttribute>
      <FieldID>188743731</FieldID>
      <FieldName>Text1</FieldName>
      <Guid>000039B7-8BBE-4CEB-82C4-FA8C0B400033</Guid>
      <Alias>PM_TASKID</Alias>
      <SecondaryPID>255869028</SecondaryPID>
    </ExtendedAttribute>
    <ExtendedAttribute>
      <FieldID>188743734</FieldID>
      <FieldName>Text2</FieldName>
      <Guid>000039B7-8BBE-4CEB-82C4-FA8C0B400036</Guid>
      <Alias>PM_Actual_Work</Alias>
      <SecondaryPID>255869029</SecondaryPID>
    </ExtendedAttribute>
    <ExtendedAttribute>
      <FieldID>188743737</FieldID>
      <FieldName>Text3</FieldName>
      <Guid>000039B7-8BBE-4CEB-82C4-FA8C0B400039</Guid>
      <Alias>PM_Task_Theme</Alias>
      <SecondaryPID>255869030</SecondaryPID>
    </ExtendedAttribute>
    <ExtendedAttribute>
      <FieldID>188743740</FieldID>
      <FieldName>Text4</FieldName>
      <Guid>000039B7-8BBE-4CEB-82C4-FA8C0B40003C</Guid>
      <Alias>PM_Dropdown_Extended_Columns</Alias>
      <SecondaryPID>255869031</SecondaryPID>
    </ExtendedAttribute>
    <ExtendedAttribute>
      <FieldID>188743752</FieldID>
      <FieldName>Flag1</FieldName>
      <Guid>000039B7-8BBE-4CEB-82C4-FA8C0B400048</Guid>
      <Alias>PM_Task_Is_Priority_Null</Alias>
      <SecondaryPID>255868938</SecondaryPID>
    </ExtendedAttribute>
  </ExtendedAttributes>
  <Calendars>
    <Calendar>
      <UID>1</UID>
      <GUID>6761570D-785D-E511-827E-FCAA14B63A94</GUID>
      <Name>Standard</Name>
      <IsBaseCalendar>1</IsBaseCalendar>
      <IsBaselineCalendar>0</IsBaselineCalendar>
      <BaseCalendarUID>-1</BaseCalendarUID>
      <WeekDays>
        <WeekDay>
          <DayType>1</DayType>
          <DayWorking>0</DayWorking>
        </WeekDay>
        <WeekDay>
          <DayType>2</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>3</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>4</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>5</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>6</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>7</DayType>
          <DayWorking>0</DayWorking>
        </WeekDay>
      </WeekDays>
    </Calendar>
    <Calendar>
      <UID>2</UID>
      <GUID>47771CDB-D608-438E-9A5F-8E1442BF4AC8</GUID>
      <Name>Wayne Lawless</Name>
      <IsBaseCalendar>0</IsBaseCalendar>
      <BaseCalendarUID>1</BaseCalendarUID>
    </Calendar>
    <Calendar>
      <UID>3</UID>
      <GUID>A70C6B55-7746-4157-BEA8-13E98D752FAD</GUID>
      <Name>Lindsay Hendrix</Name>
      <IsBaseCalendar>0</IsBaseCalendar>
      <BaseCalendarUID>1</BaseCalendarUID>
    </Calendar>
    <Calendar>
      <UID>4</UID>
      <GUID>3BA36CDA-6473-42B8-B070-FA8F7DE6D8D7</GUID>
      <Name>Andrew Spear</Name>
      <IsBaseCalendar>0</IsBaseCalendar>
      <BaseCalendarUID>1</BaseCalendarUID>
    </Calendar>
    <Calendar>
      <UID>5</UID>
      <GUID>2A9C47F8-4458-4D1D-B1A1-DFA5F7E88B4D</GUID>
      <Name>Jennifer Jones (Sample)</Name>
      <IsBaseCalendar>0</IsBaseCalendar>
      <BaseCalendarUID>1</BaseCalendarUID>
    </Calendar>
    <Calendar>
      <UID>6</UID>
      <GUID>89D85CCB-4AF6-4280-954D-1AF84AB93113</GUID>
      <Name>Mike Smith (Sample)</Name>
      <IsBaseCalendar>0</IsBaseCalendar>
      <BaseCalendarUID>1</BaseCalendarUID>
    </Calendar>
  </Calendars>
  <Tasks>
    <Task>
      <UID>0</UID>
      <GUID>BA5FBB29-C572-E511-828B-FCAA14B63A94</GUID>
      <ID>0</ID>
      <Name>MSProjectTemplateFile</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2015-10-15T11:44:00</CreateDate>
      <WBS>0</WBS>
      <OutlineNumber>0</OutlineNumber>
      <OutlineLevel>0</OutlineLevel>
      <Priority>500</Priority>
      <Start>2015-10-15T08:00:00</Start>
      <Finish>2015-10-15T08:00:00</Finish>
      <Duration>PT0H0M0S</Duration>
      <ManualStart>2015-10-15T08:00:00</ManualStart>
      <ManualFinish>2015-10-15T08:00:00</ManualFinish>
      <ManualDuration>PT0H0M0S</ManualDuration>
      <DurationFormat>21</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>1</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>1</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <EarlyStart>2015-10-15T08:00:00</EarlyStart>
      <EarlyFinish>2015-10-15T08:00:00</EarlyFinish>
      <LateStart>2015-10-15T08:00:00</LateStart>
      <LateFinish>2015-10-15T08:00:00</LateFinish>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>0</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743740</FieldID>
        <Value>[]</Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>1</UID>
      <GUID>852d9e96-b821-4596-b903-a765cb41123e</GUID>
      <ID>1</ID>
      <Name>1. Analysis</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>1</WBS>
      <OutlineNumber>1</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-08-15T08:00:00</Start>
      <Duration>PT160H0M0S</Duration>
      <ManualStart>2024-08-15T08:00:00</ManualStart>
      <ManualDuration>PT160H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT62H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>52</PercentComplete>
      <PercentWorkComplete>52</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT32H14M24S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT62H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-08-15T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <Notes>Do stuff here.</Notes>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>2d9a65e8-22f1-4ea9-9fb8-766954da4fe4</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>navy</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>2</UID>
      <GUID>26e30a6c-e803-4c20-bb80-6779c06c3ce4</GUID>
      <ID>2</ID>
      <Name>On-Site Meetings</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>1.1</WBS>
      <OutlineNumber>1.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-08-15T08:00:00</Start>
      <Duration>PT32H0M0S</Duration>
      <ManualStart>2024-08-15T08:00:00</ManualStart>
      <ManualDuration>PT32H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT18H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT18H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT18H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-08-15T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <Notes>Everything you need to describe the task can be listed here</Notes>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>cec0c34b-a84f-4ebc-8ab1-f92334fa568e</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>navy</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>3</UID>
      <GUID>9e4d1ff8-85c1-4cc7-b36a-a6545b58012f</GUID>
      <ID>3</ID>
      <Name>Discussions with Stakeholders</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>1.2</WBS>
      <OutlineNumber>1.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-08-20T08:00:00</Start>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2024-08-20T08:00:00</ManualStart>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-08-20T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>937b0d89-e393-44aa-9e96-46f8f209b7d6</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>navy</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>4</UID>
      <GUID>49f31a90-056e-4ccb-92e3-7d7946754ba1</GUID>
      <ID>4</ID>
      <Name>Stakeholder Requirement 1</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>1.2.1</WBS>
      <OutlineNumber>1.2.1</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-08-20T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-08-20T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-08-20T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>fa3547da-e9f0-4740-801f-db2d272560cb</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>navy</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>2</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>5</UID>
      <GUID>082be7be-b784-459d-9c20-784499f20386</GUID>
      <ID>5</ID>
      <Name>Stakeholder Requirement 2</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>1.2.2</WBS>
      <OutlineNumber>1.2.2</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-08-20T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-08-20T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-08-20T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>cf7a8140-4578-4b4d-91c2-4ec5503f2d25</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>navy</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>2</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>6</UID>
      <GUID>705c3b79-7113-477f-80d3-90f96ad9f6e2</GUID>
      <ID>6</ID>
      <Name>Customer Requirement 1</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>1.2.3</WBS>
      <OutlineNumber>1.2.3</OutlineNumber>
      <OutlineLevel>3</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-08-20T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-08-20T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>100</PercentComplete>
      <PercentWorkComplete>100</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-08-20T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>eb0bb794-e0e1-425a-a3ba-dec6d5e0823a</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>navy</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>2</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>7</UID>
      <GUID>4d66e1cf-701b-49c0-9f14-a1f5f30dd884</GUID>
      <ID>7</ID>
      <Name>Document Current Systems</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>1.3</WBS>
      <OutlineNumber>1.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-08-29T08:00:00</Start>
      <Duration>PT64H0M0S</Duration>
      <ManualStart>2024-08-29T08:00:00</ManualStart>
      <ManualDuration>PT64H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT12H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>25</PercentComplete>
      <PercentWorkComplete>25</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT3H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT12H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-08-29T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>30241447-448e-4a88-8257-c0a266468e91</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>navy</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>8</UID>
      <GUID>edd0a062-9cc0-4b17-96b5-db842590cf07</GUID>
      <ID>8</ID>
      <Name>Analysis Complete</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>1.4</WBS>
      <OutlineNumber>1.4</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-10T08:00:00</Start>
      <Duration>PT16H0M0S</Duration>
      <ManualStart>2024-09-10T08:00:00</ManualStart>
      <ManualDuration>PT16H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT32H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT32H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-10T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>1f0cc08b-9be1-4980-b050-54ce24a32066</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>navy</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>7</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>9</UID>
      <GUID>527ba481-8423-4740-a190-7e8007dc2950</GUID>
      <ID>9</ID>
      <Name>2. Design</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>2</WBS>
      <OutlineNumber>2</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-12T08:00:00</Start>
      <Duration>PT128H0M0S</Duration>
      <ManualStart>2024-09-12T08:00:00</ManualStart>
      <ManualDuration>PT128H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT50H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT50H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-12T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>e3222b8b-2537-4df2-a107-18c1a4723e67</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>green</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>10</UID>
      <GUID>a4ab1be8-a163-4df4-9ef0-52ed591b848c</GUID>
      <ID>10</ID>
      <Name>Design Database</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>2.1</WBS>
      <OutlineNumber>2.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-12T08:00:00</Start>
      <Duration>PT32H0M0S</Duration>
      <ManualStart>2024-09-12T08:00:00</ManualStart>
      <ManualDuration>PT32H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT6H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT6H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-12T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>e79e203e-b1c8-416a-92ce-043c1f9f8c94</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>green</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>8</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>11</UID>
      <GUID>8c820621-b194-4b8b-a69e-502117618d5c</GUID>
      <ID>11</ID>
      <Name>Software Design</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>2.2</WBS>
      <OutlineNumber>2.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-18T08:00:00</Start>
      <Duration>PT40H0M0S</Duration>
      <ManualStart>2024-09-18T08:00:00</ManualStart>
      <ManualDuration>PT40H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT12H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT12H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-18T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>150a5917-6c1a-4e69-bba3-3abe00262d31</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>green</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>10</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>12</UID>
      <GUID>0f23407c-191a-4ac4-8a73-87bec4ac8d51</GUID>
      <ID>12</ID>
      <Name>Interface Design</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>2.3</WBS>
      <OutlineNumber>2.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-25T08:00:00</Start>
      <Duration>PT16H0M0S</Duration>
      <ManualStart>2024-09-25T08:00:00</ManualStart>
      <ManualDuration>PT16H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT8H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-25T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>273f270c-0c3f-4a4a-9587-743e3ab3af53</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>green</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>11</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>13</UID>
      <GUID>7ce9e005-dd0a-45d1-9c76-8bb262de1264</GUID>
      <ID>13</ID>
      <Name>Create Design Specification</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>2.4</WBS>
      <OutlineNumber>2.4</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-27T08:00:00</Start>
      <Duration>PT40H0M0S</Duration>
      <ManualStart>2024-09-27T08:00:00</ManualStart>
      <ManualDuration>PT40H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT8H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-27T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>8892b292-78e7-4f23-8cd2-7f61bb1f32d0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>green</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>12</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>14</UID>
      <GUID>425eb443-95e5-493b-b45d-c33b1a93fa14</GUID>
      <ID>14</ID>
      <Name>Design Complete</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>2.5</WBS>
      <OutlineNumber>2.5</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-03T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-10-03T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT16H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT16H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-03T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>161d7f92-f70c-4a8f-8ca7-d22ec7792149</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>green</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>13</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>15</UID>
      <GUID>efbbf579-999f-4f13-bd33-5782c5e878f4</GUID>
      <ID>15</ID>
      <Name>3. Development</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>3</WBS>
      <OutlineNumber>3</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-16T08:00:00</Start>
      <Duration>PT184H0M0S</Duration>
      <ManualStart>2024-09-16T08:00:00</ManualStart>
      <ManualDuration>PT184H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-16T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>ba626376-44ff-4a74-a46f-67154349be7c</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>magenta</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>16</UID>
      <GUID>b451e1af-081d-4759-bf1a-474ee0fe58b5</GUID>
      <ID>16</ID>
      <Name>Deploy Development Environment</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>3.1</WBS>
      <OutlineNumber>3.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-16T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-09-16T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-16T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>aa1379eb-5ebe-4047-bb3d-c0485da1fb06</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>magenta</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>17</UID>
      <GUID>0a78f00f-74c0-4918-826a-fff4e7edf3ca</GUID>
      <ID>17</ID>
      <Name>Develop System Modules</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>3.2</WBS>
      <OutlineNumber>3.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-09-16T08:00:00</Start>
      <Duration>PT88H0M0S</Duration>
      <ManualStart>2024-09-16T08:00:00</ManualStart>
      <ManualDuration>PT88H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-09-16T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>91257056-1116-400c-b7d2-c00f2ed8bc32</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>magenta</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>8</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>9600</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>18</UID>
      <GUID>44e0774c-9fc6-42a7-8678-c2819044c4ef</GUID>
      <ID>18</ID>
      <Name>Integrate System Modules</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>3.3</WBS>
      <OutlineNumber>3.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-01T08:00:00</Start>
      <Duration>PT56H0M0S</Duration>
      <ManualStart>2024-10-01T08:00:00</ManualStart>
      <ManualDuration>PT56H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-01T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>e356af03-00de-41fe-b364-abd4490b0c6e</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>magenta</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>17</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>19</UID>
      <GUID>bb94f314-75cf-428e-aba2-ae45dac83dc9</GUID>
      <ID>19</ID>
      <Name>Perform Initial Testing</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>3.4</WBS>
      <OutlineNumber>3.4</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-10T08:00:00</Start>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2024-10-10T08:00:00</ManualStart>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-10T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>8806de63-44d0-4631-bc20-b281c9b7c921</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>magenta</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>18</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>20</UID>
      <GUID>961904e3-6c0f-4599-b2b6-25997961a6b1</GUID>
      <ID>20</ID>
      <Name>Development Complete</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>3.5</WBS>
      <OutlineNumber>3.5</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-14T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-10-14T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-14T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>f3621ed4-287f-4e32-ae63-04c7ea5f2002</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>magenta</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>19</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>21</UID>
      <GUID>725d1261-1a51-4ff7-be73-7619b640b6d1</GUID>
      <ID>21</ID>
      <Name>4. Testing</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>4</WBS>
      <OutlineNumber>4</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-14T08:00:00</Start>
      <Duration>PT168H0M0S</Duration>
      <ManualStart>2024-10-14T08:00:00</ManualStart>
      <ManualDuration>PT168H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-14T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>e519b5c9-5d8a-45dc-817c-3f078df1b67c</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightyellow</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>22</UID>
      <GUID>0d2256ea-48ff-4177-b818-954c9d42c393</GUID>
      <ID>22</ID>
      <Name>Deploy Test Environment</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>4.1</WBS>
      <OutlineNumber>4.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-14T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-10-14T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-14T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>8a92cf51-74be-4d5f-970b-f11b205e43ee</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightyellow</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>23</UID>
      <GUID>b4fe7a53-108a-4dcd-9160-9e0b235d982d</GUID>
      <ID>23</ID>
      <Name>Perform System Testing</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>4.2</WBS>
      <OutlineNumber>4.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-14T08:00:00</Start>
      <Duration>PT64H0M0S</Duration>
      <ManualStart>2024-10-14T08:00:00</ManualStart>
      <ManualDuration>PT64H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-14T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>bd785bca-3ffb-428f-acee-c3e90c992e22</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightyellow</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>17</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>43200</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>24</UID>
      <GUID>5bd1bb0a-cab5-4534-a3d2-e71f9b005a36</GUID>
      <ID>24</ID>
      <Name>Document Issues Found</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>4.3</WBS>
      <OutlineNumber>4.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-24T08:00:00</Start>
      <Duration>PT48H0M0S</Duration>
      <ManualStart>2024-10-24T08:00:00</ManualStart>
      <ManualDuration>PT48H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-24T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>ecdbfb82-d707-4e45-b561-c6e0440ae8df</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightyellow</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>23</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>25</UID>
      <GUID>f101174b-017a-4e42-bfcb-31f3ed891845</GUID>
      <ID>25</ID>
      <Name>Bug 1</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>4.4</WBS>
      <OutlineNumber>4.4</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-14T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-10-14T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-14T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>db5541f7-1f2b-4755-b801-37cc0637294b</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightyellow</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>26</UID>
      <GUID>d0b2eb0d-6e49-43cf-b289-2ea9865d3c13</GUID>
      <ID>26</ID>
      <Name>Bug 2</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>4.5</WBS>
      <OutlineNumber>4.5</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-10-14T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-10-14T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-10-14T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>e8f76653-3ce2-4233-a3f3-3362c4cb44b5</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightyellow</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>27</UID>
      <GUID>d4133f97-0895-4c8d-8da6-ec2cbe163ea4</GUID>
      <ID>27</ID>
      <Name>Correct Issues Found</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>4.6</WBS>
      <OutlineNumber>4.6</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-01T08:00:00</Start>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2024-11-01T08:00:00</ManualStart>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-01T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>c84bd358-f00e-4804-850e-9849efdfbe74</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightyellow</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>24</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>28</UID>
      <GUID>d3841d02-8b73-49ee-b157-1b2f74420399</GUID>
      <ID>28</ID>
      <Name>Testing Complete</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>4.7</WBS>
      <OutlineNumber>4.7</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-05T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-11-05T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-05T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>f58bf590-2919-4523-9106-1ef1055f34c5</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightyellow</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>27</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>29</UID>
      <GUID>1deb8586-b5a9-473f-89c4-6e24b24ec0e3</GUID>
      <ID>29</ID>
      <Name>5. Implementation</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>5</WBS>
      <OutlineNumber>5</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-06T08:00:00</Start>
      <Duration>PT128H0M0S</Duration>
      <ManualStart>2024-11-06T08:00:00</ManualStart>
      <ManualDuration>PT128H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-06T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>49586667-c747-4252-8031-aa1b5cb48c37</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>orange</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>30</UID>
      <GUID>e9a7f489-c410-418f-b09d-ca0caa8e73fc</GUID>
      <ID>30</ID>
      <Name>On-Site Installation</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>5.1</WBS>
      <OutlineNumber>5.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-06T08:00:00</Start>
      <Duration>PT32H0M0S</Duration>
      <ManualStart>2024-11-06T08:00:00</ManualStart>
      <ManualDuration>PT32H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-06T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>64f5041b-4d16-4e28-a002-4d4ddc7f8312</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>orange</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>28</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>31</UID>
      <GUID>61ff3fe2-6418-465e-810a-d9fcbb183de1</GUID>
      <ID>31</ID>
      <Name>Setup Database</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>5.2</WBS>
      <OutlineNumber>5.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-12T08:00:00</Start>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2024-11-12T08:00:00</ManualStart>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-12T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>a2095aa4-510e-4a3a-b206-122cf97faea8</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>orange</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>30</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>32</UID>
      <GUID>3ba9c5fc-d1fd-4dbd-9f1e-016a9f0f5d5e</GUID>
      <ID>32</ID>
      <Name>Import Live Data</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>5.3</WBS>
      <OutlineNumber>5.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-15T08:00:00</Start>
      <Duration>PT40H0M0S</Duration>
      <ManualStart>2024-11-15T08:00:00</ManualStart>
      <ManualDuration>PT40H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-15T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>54b840ca-0fb3-4bb2-ab6e-f240180b5e11</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>orange</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>31</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>33</UID>
      <GUID>c0e011da-290d-446d-b6e5-c26fa7439958</GUID>
      <ID>33</ID>
      <Name>Integrate Desktop</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>5.4</WBS>
      <OutlineNumber>5.4</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-22T08:00:00</Start>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2024-11-22T08:00:00</ManualStart>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-22T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>63f5bbb7-806f-4979-8a01-b10a2b4ecca3</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>orange</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>32</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>34</UID>
      <GUID>c3f887af-71e1-4d8f-a988-f0b89f74903d</GUID>
      <ID>34</ID>
      <Name>Implementation Complete</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>5.5</WBS>
      <OutlineNumber>5.5</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-26T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-11-26T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-26T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>c0c313de-067d-4fd2-8efc-b5af82b55d2a</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>orange</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>33</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>35</UID>
      <GUID>01d5b8f1-2162-4f75-ab8e-2f9e73f203b5</GUID>
      <ID>35</ID>
      <Name>6. Training</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>6</WBS>
      <OutlineNumber>6</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-12T08:00:00</Start>
      <Duration>PT96H0M0S</Duration>
      <ManualStart>2024-11-12T08:00:00</ManualStart>
      <ManualDuration>PT96H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-12T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>2cc6e2b7-0482-4eff-a225-5eade9066e26</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>brown</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>36</UID>
      <GUID>2fbe3ed1-290f-493d-bd93-8bf9541336bc</GUID>
      <ID>36</ID>
      <Name>Train Administrators</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>6.1</WBS>
      <OutlineNumber>6.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-12T08:00:00</Start>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2024-11-12T08:00:00</ManualStart>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-12T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>d5d6c891-c659-4bf9-97ac-8f945c04bf30</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>brown</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>30</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>37</UID>
      <GUID>1dec86cf-927e-421c-ae2a-9867ca3a2f24</GUID>
      <ID>37</ID>
      <Name>Train Users</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>6.2</WBS>
      <OutlineNumber>6.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-15T08:00:00</Start>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2024-11-15T08:00:00</ManualStart>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-15T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>9e137e3b-555f-4935-8020-6ab69c25335a</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>brown</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>36</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>38</UID>
      <GUID>45457665-a03c-4113-8cd8-6496d06b7934</GUID>
      <ID>38</ID>
      <Name>Training Complete</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>6.3</WBS>
      <OutlineNumber>6.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-26T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-11-26T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-26T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>65b80d0f-786e-4678-9d92-13108fd4924e</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>brown</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>37</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>34</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>39</UID>
      <GUID>2b724ac4-7ec6-4158-93d8-95beee64acbf</GUID>
      <ID>39</ID>
      <Name>7. Documentation</Name>
      <Active>1</Active>
      <Manual>0</Manual>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>7</WBS>
      <OutlineNumber>7</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-27T08:00:00</Start>
      <Duration>PT72H0M0S</Duration>
      <ManualStart>2024-11-27T08:00:00</ManualStart>
      <ManualDuration>PT72H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT64H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>1</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT64H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>0</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-27T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>3e57178d-3a5f-4211-a757-72538d0a99b0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightgreen</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
    </Task>
    <Task>
      <UID>40</UID>
      <GUID>27d50e7a-dea1-4e99-be8d-8306f09ef974</GUID>
      <ID>40</ID>
      <Name>Technical Documentation</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>7.1</WBS>
      <OutlineNumber>7.1</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-11-27T08:00:00</Start>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2024-11-27T08:00:00</ManualStart>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT24H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT24H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-11-27T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>ad72b106-04c2-40fb-a48e-75d6e041b934</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightgreen</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>38</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>41</UID>
      <GUID>fb683115-7f5a-4953-b3e7-3d373a5a90c7</GUID>
      <ID>41</ID>
      <Name>User Documentation</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>7.2</WBS>
      <OutlineNumber>7.2</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-12-02T08:00:00</Start>
      <Duration>PT40H0M0S</Duration>
      <ManualStart>2024-12-02T08:00:00</ManualStart>
      <ManualDuration>PT40H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT40H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>0</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT40H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-12-02T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>f07371c7-ffea-45fb-a5c6-5b1637a3e277</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightgreen</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>40</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>42</UID>
      <GUID>86977bdc-d190-4ae4-a00a-17955fac1e4a</GUID>
      <ID>42</ID>
      <Name>Project Complete</Name>
      <Active>1</Active>
      <IsNull>0</IsNull>
      <CreateDate>2025-05-15T03:04:21</CreateDate>
      <WBS>7.3</WBS>
      <OutlineNumber>7.3</OutlineNumber>
      <OutlineLevel>2</OutlineLevel>
      <Priority>500</Priority>
      <Start>2024-12-06T08:00:00</Start>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2024-12-06T08:00:00</ManualStart>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT8H0M0S</Work>
      <ResumeValid>0</ResumeValid>
      <EffortDriven>0</EffortDriven>
      <Recurring>0</Recurring>
      <OverAllocated>0</OverAllocated>
      <Estimated>0</Estimated>
      <Milestone>1</Milestone>
      <Summary>0</Summary>
      <DisplayAsSummary>0</DisplayAsSummary>
      <Critical>0</Critical>
      <IsSubproject>0</IsSubproject>
      <IsSubprojectReadOnly>0</IsSubprojectReadOnly>
      <ExternalTask>0</ExternalTask>
      <StartVariance>0</StartVariance>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>0.00</WorkVariance>
      <FreeSlack>0</FreeSlack>
      <TotalSlack>0</TotalSlack>
      <StartSlack>0</StartSlack>
      <FinishSlack>0</FinishSlack>
      <FixedCost>0</FixedCost>
      <FixedCostAccrual>3</FixedCostAccrual>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Cost>0</Cost>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualDuration>PT0H0M0S</ActualDuration>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualWork>PT0H0M0S</ActualWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingCost>0</RemainingCost>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <ACWP>0.00</ACWP>
      <CV>0.00</CV>
      <ConstraintType>4</ConstraintType>
      <CalendarUID>-1</CalendarUID>
      <ConstraintDate>2024-12-06T08:00:00</ConstraintDate>
      <LevelAssignments>1</LevelAssignments>
      <LevelingCanSplit>1</LevelingCanSplit>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>8</LevelingDelayFormat>
      <IgnoreResourceCalendar>1</IgnoreResourceCalendar>
      <HideBar>0</HideBar>
      <Rollup>0</Rollup>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <PhysicalPercentComplete>0</PhysicalPercentComplete>
      <EarnedValueMethod>0</EarnedValueMethod>
      <IsPublished>1</IsPublished>
      <CommitmentType>0</CommitmentType>
      <ExtendedAttribute>
        <FieldID>188743731</FieldID>
        <Value>d9d48182-ef41-4fd4-af83-49be46e69874</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743737</FieldID>
        <Value>lightgreen</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743752</FieldID>
        <Value>0</Value>
      </ExtendedAttribute>
      <ExtendedAttribute>
        <FieldID>188743734</FieldID>
        <Value>
        </Value>
      </ExtendedAttribute>
      <PredecessorLink>
        <PredecessorUID>41</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
  </Tasks>
  <Resources>
    <Resource>
      <UID>0</UID>
      <GUID>A0CB8B7E-2A8C-436D-0000-0000000000FF</GUID>
      <ID>0</ID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <WorkGroup>0</WorkGroup>
      <MaxUnits>1.00</MaxUnits>
      <PeakUnits>0.00</PeakUnits>
      <OverAllocated>0</OverAllocated>
      <CanLevel>1</CanLevel>
      <AccrueAt>3</AccrueAt>
      <Work>PT0H0M0S</Work>
      <RegularWork>PT0H0M0S</RegularWork>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <PercentWorkComplete>0</PercentWorkComplete>
      <StandardRate>0</StandardRate>
      <StandardRateFormat>2</StandardRateFormat>
      <Cost>0</Cost>
      <OvertimeRate>0</OvertimeRate>
      <OvertimeRateFormat>2</OvertimeRateFormat>
      <OvertimeCost>0</OvertimeCost>
      <CostPerUse>0</CostPerUse>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <WorkVariance>0.00</WorkVariance>
      <CostVariance>0</CostVariance>
      <SV>0.00</SV>
      <CV>0.00</CV>
      <ACWP>0.00</ACWP>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <IsGeneric>0</IsGeneric>
      <IsInactive>0</IsInactive>
      <IsEnterprise>0</IsEnterprise>
      <BookingType>0</BookingType>
      <CreationDate>2015-10-15T11:44:00</CreationDate>
      <IsCostResource>0</IsCostResource>
      <IsBudget>0</IsBudget>
    </Resource>
    <Resource>
      <UID>1</UID>
      <GUID>47771CDB-D608-438E-9A5F-8E1442BF4AC8</GUID>
      <ID>1</ID>
      <Name>Wayne Lawless</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>WL</Initials>
      <WorkGroup>0</WorkGroup>
      <MaxUnits>1.00</MaxUnits>
      <PeakUnits>0.00</PeakUnits>
      <OverAllocated>0</OverAllocated>
      <CanLevel>1</CanLevel>
      <AccrueAt>3</AccrueAt>
      <Work>PT0H0M0S</Work>
      <RegularWork>PT0H0M0S</RegularWork>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <PercentWorkComplete>0</PercentWorkComplete>
      <StandardRate>45.000000</StandardRate>
      <StandardRateFormat>2</StandardRateFormat>
      <Cost>0</Cost>
      <OvertimeRate>0</OvertimeRate>
      <OvertimeRateFormat>2</OvertimeRateFormat>
      <OvertimeCost>0</OvertimeCost>
      <CostPerUse>0</CostPerUse>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <WorkVariance>0.00</WorkVariance>
      <CostVariance>0</CostVariance>
      <SV>0.00</SV>
      <CV>0.00</CV>
      <ACWP>0.00</ACWP>
      <CalendarUID>2</CalendarUID>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <IsGeneric>0</IsGeneric>
      <IsInactive>0</IsInactive>
      <IsEnterprise>0</IsEnterprise>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
      <IsCostResource>0</IsCostResource>
      <IsBudget>0</IsBudget>
    </Resource>
    <Resource>
      <UID>2</UID>
      <GUID>A70C6B55-7746-4157-BEA8-13E98D752FAD</GUID>
      <ID>2</ID>
      <Name>Lindsay Hendrix</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>LH</Initials>
      <WorkGroup>0</WorkGroup>
      <MaxUnits>1.00</MaxUnits>
      <PeakUnits>0.00</PeakUnits>
      <OverAllocated>0</OverAllocated>
      <CanLevel>1</CanLevel>
      <AccrueAt>3</AccrueAt>
      <Work>PT0H0M0S</Work>
      <RegularWork>PT0H0M0S</RegularWork>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <PercentWorkComplete>0</PercentWorkComplete>
      <StandardRate>125.000000</StandardRate>
      <StandardRateFormat>2</StandardRateFormat>
      <Cost>0</Cost>
      <OvertimeRate>0</OvertimeRate>
      <OvertimeRateFormat>2</OvertimeRateFormat>
      <OvertimeCost>0</OvertimeCost>
      <CostPerUse>0</CostPerUse>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <WorkVariance>0.00</WorkVariance>
      <CostVariance>0</CostVariance>
      <SV>0.00</SV>
      <CV>0.00</CV>
      <ACWP>0.00</ACWP>
      <CalendarUID>3</CalendarUID>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <IsGeneric>0</IsGeneric>
      <IsInactive>0</IsInactive>
      <IsEnterprise>0</IsEnterprise>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
      <IsCostResource>0</IsCostResource>
      <IsBudget>0</IsBudget>
    </Resource>
    <Resource>
      <UID>3</UID>
      <GUID>3BA36CDA-6473-42B8-B070-FA8F7DE6D8D7</GUID>
      <ID>3</ID>
      <Name>Andrew Spear</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>AS</Initials>
      <WorkGroup>0</WorkGroup>
      <MaxUnits>1.00</MaxUnits>
      <PeakUnits>0.00</PeakUnits>
      <OverAllocated>0</OverAllocated>
      <CanLevel>1</CanLevel>
      <AccrueAt>3</AccrueAt>
      <Work>PT0H0M0S</Work>
      <RegularWork>PT0H0M0S</RegularWork>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <PercentWorkComplete>0</PercentWorkComplete>
      <StandardRate>45.000000</StandardRate>
      <StandardRateFormat>2</StandardRateFormat>
      <Cost>0</Cost>
      <OvertimeRate>0</OvertimeRate>
      <OvertimeRateFormat>2</OvertimeRateFormat>
      <OvertimeCost>0</OvertimeCost>
      <CostPerUse>0</CostPerUse>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <WorkVariance>0.00</WorkVariance>
      <CostVariance>0</CostVariance>
      <SV>0.00</SV>
      <CV>0.00</CV>
      <ACWP>0.00</ACWP>
      <CalendarUID>4</CalendarUID>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <IsGeneric>0</IsGeneric>
      <IsInactive>0</IsInactive>
      <IsEnterprise>0</IsEnterprise>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
      <IsCostResource>0</IsCostResource>
      <IsBudget>0</IsBudget>
    </Resource>
    <Resource>
      <UID>4</UID>
      <GUID>2A9C47F8-4458-4D1D-B1A1-DFA5F7E88B4D</GUID>
      <ID>4</ID>
      <Name>Jennifer Jones (Sample)</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>JJ</Initials>
      <WorkGroup>0</WorkGroup>
      <MaxUnits>1.00</MaxUnits>
      <PeakUnits>0.00</PeakUnits>
      <OverAllocated>0</OverAllocated>
      <CanLevel>1</CanLevel>
      <AccrueAt>3</AccrueAt>
      <Work>PT0H0M0S</Work>
      <RegularWork>PT0H0M0S</RegularWork>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <PercentWorkComplete>0</PercentWorkComplete>
      <StandardRate>80.000000</StandardRate>
      <StandardRateFormat>2</StandardRateFormat>
      <Cost>0</Cost>
      <OvertimeRate>0</OvertimeRate>
      <OvertimeRateFormat>2</OvertimeRateFormat>
      <OvertimeCost>0</OvertimeCost>
      <CostPerUse>0</CostPerUse>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <WorkVariance>0.00</WorkVariance>
      <CostVariance>0</CostVariance>
      <SV>0.00</SV>
      <CV>0.00</CV>
      <ACWP>0.00</ACWP>
      <CalendarUID>5</CalendarUID>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <IsGeneric>0</IsGeneric>
      <IsInactive>0</IsInactive>
      <IsEnterprise>0</IsEnterprise>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
      <IsCostResource>0</IsCostResource>
      <IsBudget>0</IsBudget>
    </Resource>
    <Resource>
      <UID>5</UID>
      <GUID>89D85CCB-4AF6-4280-954D-1AF84AB93113</GUID>
      <ID>5</ID>
      <Name>Mike Smith (Sample)</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <Initials>MS</Initials>
      <WorkGroup>0</WorkGroup>
      <MaxUnits>1.00</MaxUnits>
      <PeakUnits>0.00</PeakUnits>
      <OverAllocated>0</OverAllocated>
      <CanLevel>1</CanLevel>
      <AccrueAt>3</AccrueAt>
      <Work>PT0H0M0S</Work>
      <RegularWork>PT0H0M0S</RegularWork>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <PercentWorkComplete>0</PercentWorkComplete>
      <StandardRate>90.000000</StandardRate>
      <StandardRateFormat>2</StandardRateFormat>
      <Cost>0</Cost>
      <OvertimeRate>0</OvertimeRate>
      <OvertimeRateFormat>2</OvertimeRateFormat>
      <OvertimeCost>0</OvertimeCost>
      <CostPerUse>0</CostPerUse>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <WorkVariance>0.00</WorkVariance>
      <CostVariance>0</CostVariance>
      <SV>0.00</SV>
      <CV>0.00</CV>
      <ACWP>0.00</ACWP>
      <CalendarUID>6</CalendarUID>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <IsGeneric>0</IsGeneric>
      <IsInactive>0</IsInactive>
      <IsEnterprise>0</IsEnterprise>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
      <IsCostResource>0</IsCostResource>
      <IsBudget>0</IsBudget>
    </Resource>
  </Resources>
  <Assignments>
    <Assignment>
      <UID>1</UID>
      <GUID>D7AE28C9-A1B2-4B22-B7B5-F8A408B3E34C</GUID>
      <TaskUID>2</TaskUID>
      <ResourceUID>1</ResourceUID>
      <PercentWorkComplete>100</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualFinish>2024-08-21T00:00:00</ActualFinish>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualStart>2024-08-15T08:00:00</ActualStart>
      <ActualWork>PT14H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>840000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>1</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>0.7777777777777779</PeakUnits>
      <RegularWork>PT14H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>0.7777777777777779</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT14H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>2</UID>
      <GUID>F394C8F8-D754-47F8-847D-3B83DFE6903B</GUID>
      <TaskUID>7</TaskUID>
      <ResourceUID>2</ResourceUID>
      <PercentWorkComplete>25</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>720000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>0</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>1</PeakUnits>
      <RegularWork>PT12H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT12H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>1</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT12H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>3</UID>
      <GUID>785CBACE-45AD-4DEC-89CF-437B0BAFB356</GUID>
      <TaskUID>8</TaskUID>
      <ResourceUID>1</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>960000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>1</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>0.5</PeakUnits>
      <RegularWork>PT16H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>0.5</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT16H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>4</UID>
      <GUID>61415A07-6144-4564-BB44-35E17E83FCC7</GUID>
      <TaskUID>10</TaskUID>
      <ResourceUID>3</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>360000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>0</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>1</PeakUnits>
      <RegularWork>PT6H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT6H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>1</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT6H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>5</UID>
      <GUID>157CD9D8-3E40-4D3F-A401-807F2818CAE5</GUID>
      <TaskUID>11</TaskUID>
      <ResourceUID>3</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>720000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>0</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>1</PeakUnits>
      <RegularWork>PT12H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT12H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>1</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT12H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>6</UID>
      <GUID>B3900129-19A4-436C-9F81-DAAEDD3FDDC2</GUID>
      <TaskUID>12</TaskUID>
      <ResourceUID>3</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>480000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>0</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>1</PeakUnits>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>1</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT8H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>7</UID>
      <GUID>C8020785-952B-468A-BC34-A6B869E341AA</GUID>
      <TaskUID>13</TaskUID>
      <ResourceUID>3</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>480000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>0</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>1</PeakUnits>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>1</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT8H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>8</UID>
      <GUID>8152F99A-5871-4025-8CAD-8DDAC428320D</GUID>
      <TaskUID>14</TaskUID>
      <ResourceUID>1</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>480000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>1</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>0.5</PeakUnits>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>0.5</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT8H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>9</UID>
      <GUID>E97FCB19-56C6-4B23-BB71-5B8C69A15327</GUID>
      <TaskUID>14</TaskUID>
      <ResourceUID>3</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>480000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>1</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>0.5</PeakUnits>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>0.5</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT8H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>10</UID>
      <GUID>8D848F00-EBB4-411E-B0F2-CD06CE26E493</GUID>
      <TaskUID>40</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>720000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>0</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>0.5</PeakUnits>
      <RegularWork>PT12H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT12H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>0.5</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT12H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>11</UID>
      <GUID>A46448E4-BA2B-4396-A5C5-6F2E0F654CB1</GUID>
      <TaskUID>40</TaskUID>
      <ResourceUID>5</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>720000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>0</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>0.5</PeakUnits>
      <RegularWork>PT12H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT12H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>0.5</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT12H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>12</UID>
      <GUID>14B4972C-01F1-450F-8F78-D309D61ADA2E</GUID>
      <TaskUID>41</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>2400000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>0</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>1</PeakUnits>
      <RegularWork>PT40H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT40H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>1</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT40H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
    <Assignment>
      <UID>13</UID>
      <GUID>B8C5363F-BCAC-468F-AC17-8EAB28B5FE35</GUID>
      <TaskUID>42</TaskUID>
      <ResourceUID>4</ResourceUID>
      <PercentWorkComplete>0</PercentWorkComplete>
      <ActualCost>0</ActualCost>
      <ActualOvertimeCost>0</ActualOvertimeCost>
      <ActualOvertimeWork>PT0H0M0S</ActualOvertimeWork>
      <ActualWork>PT0H0M0S</ActualWork>
      <ACWP>0.00</ACWP>
      <Confirmed>0</Confirmed>
      <Cost>0</Cost>
      <CostRateTable>0</CostRateTable>
      <RateScale>0</RateScale>
      <CostVariance>0</CostVariance>
      <CV>0.00</CV>
      <Delay>0</Delay>
      <FinishVariance>0</FinishVariance>
      <WorkVariance>480000000.00</WorkVariance>
      <HasFixedRateUnits>1</HasFixedRateUnits>
      <FixedMaterial>0</FixedMaterial>
      <LevelingDelay>0</LevelingDelay>
      <LevelingDelayFormat>10</LevelingDelayFormat>
      <LinkedFields>0</LinkedFields>
      <Milestone>1</Milestone>
      <Overallocated>0</Overallocated>
      <OvertimeCost>0</OvertimeCost>
      <OvertimeWork>PT0H0M0S</OvertimeWork>
      <PeakUnits>1</PeakUnits>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingCost>0</RemainingCost>
      <RemainingOvertimeCost>0</RemainingOvertimeCost>
      <RemainingOvertimeWork>PT0H0M0S</RemainingOvertimeWork>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <ResponsePending>0</ResponsePending>
      <StartVariance>0</StartVariance>
      <Units>1</Units>
      <UpdateNeeded>0</UpdateNeeded>
      <VAC>0.00</VAC>
      <Work>PT8H0M0S</Work>
      <WorkContour>0</WorkContour>
      <BCWS>0.00</BCWS>
      <BCWP>0.00</BCWP>
      <BookingType>0</BookingType>
      <CreationDate>2025-05-15T03:04:21</CreationDate>
    </Assignment>
  </Assignments>
</Project>